Entire refurbishment of the building with the demolition of the existing slabs that did not comply with the new overloads of use, adding a portico parallel to the facade that fits in the alignment of the corridor.
Excavation of a basement below ground level for which a foundation underpinning is executed by means of micropiles and the space under the roof is gained by the execution of metal trusses and a new copper-lined roof.
New cladding designed with wood and marble floors and coatings.
Restoration of the facade, with the restoration of the volumes and lost cornices.