MADRID | YEAR: 2022-2023 | FLOOR SIZE: 3600 M² | 37 PARKING SPACES FOR CARS AND 11 SPACES FOR MOTORCYCLES
Integral rehabilitation of the 1931 building and total redistribution of spaces for the execution of 25 homes. The building consists of 4 duplexes and 21 one-storey homes of between 55 and 150m2 built.
· Excavation of 3 basements at the bottom of the plot (outside the footprint of the existing building) for the execution of car and motorcycle parking.
· The execution of storage rooms for homes in the basement -1 is foreseen
· Dismantling of the original wooden roof of trusses and execution of a new roof respecting the original perimeter waters.
Electrical installation managed with home automation and execution of transformation center.
The exterior facades and courtyards will be rehabilitated, considering the north and east facades, protected by CIPHAN.
DHW and air conditioning installations managed with aerothermy.
The elevator and staircase core will be rehabilitated maintaining the original position and morphology.
Common facilities of swimming pool, garden area, gym and technical rooms for facilities.