Complete refurbishment of the building, former barracks in disuse and abandoned.
Demolition of the interior of the existing building with the support of the original structure of pillars and roof trusses.
Construction of exterior pile screen for excavation inside the perimeter of the building.
Construction of new concrete structure with new stage box, stalls, rehearsal rooms, secondary rooms and dressing rooms.
Equipment of new stage box with construction of stairs and access elevators to different work levels.
New air conditioning facilities by geothermal and thermoactive structures and ventilation system with air pre-treatment by circulation under foundation slab.