Replacement of the carpentry on the roof of the Assembly Hall.
Restoration of the paintings on the ceiling with their fixation, cleaning and recovery of their bright colors.
Repairing the patios.
The electrical installation, to leave the room in operation, is through the floor by placing radiant wire that has made it possible to eliminate the inadequate sheet metal element radiators.